Thursday, May 26, 2011

Morning
  • Sylvester, Wilmer, and I worked on our final project
  • Zack and i had to drill out the stripped screw
  • Then after we got it out we had to desolder the green SMD LEDs and exchange for red SMD LEDs
  • After that we had to put everything back the way we found it so we can put the back of the controller to the front of the controller
  • Then we plugged in the controller to find out that we made a malfunction in the SMD LEDs and only three lights out of four lit up, and we started pressing the buttons and the lettered buttons are a little messed up so we have to fix that on Thrusday

No comments:

Post a Comment